Complete Contract Package may also include the following:
Lead-Based Paint Addendum (required if built prior to 1978). Additional LBP Information Receipt Addendum (required if built prior to 1978). Flood Zone Disclosure and Addendum (required if located in a FEMA Flood Zone). Proof of Identity. Sales Package Verification Checklist. Lead-Based Paint (LBP) Disclosure If a property was built prior to 1978, the 2-page LBP […]